ALAMA Architecture
All Projects
NAOT Mwanza

Institutional

NAOT Mwanza

Client
Private
Location
Mwanza
Type
Institutional

Overview

An institutional project in Mwanza developed with a green-design approach that prioritises daylight, natural ventilation and locally available materials. The design responds to its lakeside climate, balancing user comfort with low running costs and a durable, low-maintenance envelope.

Gallery

NAOT Mwanza — photo 2
NAOT Mwanza — photo 3
NAOT Mwanza — photo 4
NAOT Mwanza — photo 5
Next ProjectOffice